| - Slide top landing over pole and fasten in position in well opening |
|
 |
| - Level centre pole and fasten to floor |
|
 |
| - Remove landing and pass each tread one-by-one over topof pole and form a stack at base |
|
 |
| - Re-install landing into appropriate position |
|
 |
- Slide top tread back up pole to designated height
- Level out spindle and fasten tread to centre pole
- Repeat with remaining treads |
|
 |
- Start from the top and fasten handrail to each spindle using butterfly nuts
- Pre-drill handrail with 1/8" drill bit
- Re-drill with 3/8" drill bit in order to pass toggle head through pipe handrail |
|
| KEEP IN MIND: your stair kit will include one spindle per riser. Two of the spindlers are thicker than the rest (3/4" sq). They will be the first and last spindle on the staircase. The bottom spindle may require cutting. |